| GS-LVS | General Service, Low Voltage Single-Phase (Schedule 3.1, GS-LVS-19). $1.75 base charge per day. Energy up to 200 hours-use: 9.101¢ summer / 7.696¢ winter for the first 1,200 kWh, 8.568¢ / 7.091¢ for the next 4,800, 7.699¢ / 6.087¢ beyond; energy above 200 hours-use 2.983¢ / 2.472¢. Summer is May through October. Minimum bill $2.75 per kW of the greater of current or contracted kW. | Whether a three-phase or high-voltage account landed here by default; the 5 kW minimum billing requirement; the $10 monthly credit through December 2027. |
| GS-LVT | General Service, Low Voltage Three-Phase (Schedule 3.2, GS-LVT-16). $2.25 base charge per day plus $2.90 per kW billing requirement. Energy up to 200 hours-use: 8.992¢ for the first 19,500 kWh, 6.996¢ beyond; 200 to 400 hours-use 3.189¢; above 400 hours-use 0.979¢. Same prices summer and winter. | The kW billing requirement (15-minute peak, 95 percent of kVA if Mississippi Power meters kVA); whether long-hours load would be cheaper on LGS-LV. |
| GS-HV | General Service, High Voltage (Schedule 3.3, GS-HV-18). $2.50 base per day single-phase, $3.10 three-phase, plus $2.35 per kW. Energy up to 200 hours-use: 8.944¢ summer / 8.849¢ winter for the first 39,000 kWh, 6.778¢ / 6.776¢ beyond; 200 to 400 hours-use 3.113¢ / 3.110¢; above 400 hours-use 0.978¢ / 0.975¢. 25 kW minimum billing requirement. | Whether owning your own transformation is still paying back against LGS-HV once load grows. |
| LGS-LV | Large General Service, Low Voltage (Schedule 5.1, LGS-LV-14). $750 base per month plus $8.90 per kVA billing requirement. Energy up to 200 hours-use 3.088¢; 200 to 400 hours-use 2.687¢; above 400 hours-use 0.923¢. Billing requirement never less than 75 percent of the preceding May to October peak, 75 percent of contracted kVA or 500 kVA. Five-year minimum term. | The kVA ratchet and 500 kVA floor; power factor, because kVA is what is billed; the $2,185 monthly credit through December 2027. |
| LGS-HV | Large General Service, High Voltage (Schedule 5.2, LGS-HV-14). $1,245 base per month plus $8.35 per kVA. Energy 2.912¢ / 2.628¢ / 0.888¢ across the same hours-use blocks. Same ratchet, floor and five-year term as LGS-LV; transmission-voltage delivery adjustment available at 115 kV and above. | Whether the lower energy and kVA prices are covering the cost of owning primary equipment; the same ratchet and credit checks as LGS-LV. |
| LGS-TOU | Large General Service, Time of Use (Schedule 45, LGS-TOU-19). $1,150 base per month; on-peak kVA $15.20 summer / $11.00 winter; excess kVA $4.00; energy 5.018¢ / 4.229¢ on-peak, 2.800¢ shoulder (summer only), 0.800¢ off-peak. Summer is June through September. On-peak is noon to 8 pm weekdays April through October and 6 to 10 am plus 6 to 10 pm weekdays November through March. | The 75 percent summer on-peak kVA ratchet; the minimum bill at 40 percent of contract kVA; whether your load actually avoids a window that moves twice a year. |
| LPO-TOU | Large Power, Time of Use (Schedule 47, LPO-TOU-18). $8,165 base per month; on-peak kVA $15.90 summer / $11.50 winter; excess kVA $4.45; energy 4.100¢ / 3.660¢ on-peak, 2.136¢ shoulder, 0.739¢ off-peak. 10,000 kVA minimum on-peak billing requirement; transmission-voltage service. | Reviewed account by account; the 10,000 kVA floor decides whether this schedule is a saving or a fixed cost. |