How do I know if my FPL commercial bill is correct?
OptivAI rebuilds each Florida Power & Light bill from the filed tariff for your account (GS-1, GSD-1, GSDT-1, GSLD-1, GSLDT-1, GSLD-2 or HLFT), applies the billing adjustments in force for that month and your schedule (fuel, conservation, capacity, environmental and storm protection, each a per-kWh or per-kW factor depending on the schedule), applies the transition rider credit or charge for your part of the state, checks the demand against the power factor clause and any contract minimum, and compares the result line by line with what you were charged. Anything that does not reconstruct is flagged in plain language every cycle.
Am I on the right FPL rate plan for my business?
Every cycle OptivAI compares your actual usage and demand against the FPL schedules your account is eligible for and delivers a verdict: stay, or switch and why. Common questions are whether a GS-1 account that has crossed 25 kW should be on GSD-1, whether a building with evening and weekend load would do better on GSDT-1 time-of-use, whether a steady 24-hour load qualifies for and benefits from HLFT, and whether a GSD-1 account hovering near 500 kW should plan for GSLD-1. Projected differences are labelled Projected until your own bill proves them.
Does FPL have a demand ratchet?
Not on its standard general service demand schedules. On GSD-1, GSLD-1 and GSLD-2 the billed Demand is the kW of the 30-minute period of greatest use during the month, adjusted for power factor, with no look-back to prior months. That means one bad half hour costs you one month rather than twelve, but at about $15 per kW all-in on GSD-1 it is still the most controllable number on the bill. Two things act like a ratchet: a contract minimum demand if you opted into a schedule below its threshold (25, 500 or 2,000 kW), and the power factor clause, which raises billed kW when power factor at the time of peak falls below 85 percent. HLFT uses an Annual Maximum Demand only to decide which tier you are in.
What changes on FPL bills on January 1, 2027?
Three things, two approved and one pending. The second step of the 2025 rate settlement (Docket 20250011-EI), about $705 million in base revenue, takes effect. The five-year transition rider from the Gulf Power merger ends on December 31, 2026: Northwest Florida accounts stop paying a charge (0.485¢ per kWh on GS-1 in 2026) and peninsular accounts stop receiving a small credit. And FPL has asked the Commission to approve a temporary storm surcharge for Hurricane Isaias restoration from January through December 2027 alongside a lower fuel charge; the Commission hears that on December 1, 2026. OptivAI reconstructs bills on the new filed sheets the month they take effect and shows you the before-and-after on your account.
Will the NextEra Energy and Dominion Energy merger change my FPL rates?
Not by itself. FPL's parent, NextEra Energy, announced an all-stock combination with Dominion Energy on May 18, 2026, with closing expected in the second half of 2027 subject to state and federal approvals. FPL's rates continue to be set by the Florida Public Service Commission under the 2025 settlement, which runs through 2029. OptivAI tracks the case and tells you when, and if, anything in it reaches your tariff.
What is a FPL Energy Fingerprint?
Your Energy Fingerprint is OptivAI's 12-month model of how your FPL account uses and is billed for electricity, built month by month from your utility data and the facility profile you give us at onboarding. On FPL there is no ratchet, so every month's 30-minute peak stands alone. The Fingerprint learns your month-to-month demand pattern, your power factor at peak against the 85 percent clause, and which of the 25, 500 and 2,000 kW schedule steps your account actually belongs on. Your Starting Roadmap arrives in your first cycle and sharpens every month; at month 12 the Fingerprint becomes your full Optimization Roadmap, specific to your account and labelled Projected until your bill proves it.
How much does OptivAI cost for an FPL account?
$99 per utility account per month for one to five accounts, $89 per account at six or more, on a 12-month term billed monthly. No equipment, no installation, no shared-savings split. A Starting Roadmap in your first cycle and the full Optimization Roadmap at month 12.
Do you need my FPL login?
No. You connect your account through a read-only utility connection or upload your bills. OptivAI never sees or stores a utility login.